Proline 21 Advance
WAAS / LPV
Links 2000+
Engines and APU Enrolled on MSP
Airframe Enrolled on Smart Parts Plus
ACA Ionizer Installation
Professionally Managed and Operated
Maintained by Bombardier Authorized Service Facility
10 Passenger Configuration
AIRFRAME / TOTAL LANDINGS / ENGINES / APU / WEIGHT
AIRFRAME
Total Time Since New 6,264 Hours (Since September 2025)
Total Landings Since New 2,471 Landings
Home Base Toronto, Canada
Program Coverage Bombardier Smart Parts Plus
ENGINES
Left Engine Right Engine
Description Honeywell AS907-1-1A
Serial Number(s) P118142 P118140
Total Hours Since New 6,264 Hours 6,264 Hours
Total Cycles Since New 2,471 Cycles 2,471 Cycles
Program Coverage Honeywell MSP
Maintenance & Inspections
Inspection Last Performed Next Due
12 Month July 2025 September 2026
24 Month August 2024 July 2026
48 Month August 2024 July 2028
96 Month July 2020 August 2028
AVIONICS & CONNECTIVITY
The Bombardier Challenger 300 is equipped with an integrated Collins Pro Line 21 Advanced avionics suite.
NOTABLE AVIONICS UPGRADES
Service Bulletin Description
SB 100-23-04 Installation of 3rd VHF
SB 100-23-08 Installation of the Iridium Antenna
SB 100-34-36 Installation of Proline 21 Advanced
Interior & Entertainment
Number of Passengers Nine (9) Passenger + One (1) Belted Lavatory
Galley Location Forward
Forward Cabin Configuration Four (4) Place Club Seating
Aft Cabin Configuration Two (2) Place Club Seating Opposite Three (3) Place Divan
Lavatory Location(s) Aft
Last Refurbished Date April 2020
EXTERIOR
Base Paint Color(s) Overall Matterhorn White
Stripe Color(s) Blue, Green, and Silver
Last Painted Date April 2020